Chief Measurer's Report
The Chief Measurer reports on issues with fittings that extend the waterline length, such as lower pintles and projecting tabs on the transom. A proposed Chief Measurers Ruling addresses these concerns, detailing specific requirements for the position and extension of fittings in relation to the transom.
View original on Google Drive · page 4
The scanned issue opens in Google Drive; turn to page 4.
This is a summary. The full article text is © the Thistle Class Association — read the original scan via the link above.